OOI Cyberinfrastructure Development
This is the homepage describing prototyping and construction development for the Ocean Observatories Initiative Cyberinfrastructure (OOI CI).
- New Developers: Here's the developers tutorial
- New Developers Guide to JIRA Task Management
- Calendar of events and meetings for CI DEV
- Development Team Meetings*
Cyberinfrastructure Release 1 Construction
The construction effort of the OOI CI commences October 12, 2009 and will continue through the summer of 2014. The CI deliverables will be developed and deployed across five releases. Release 1 will be deployed into production March 2011. Each release has 7 iterations of 8 weeks duration. Iterations 1 and 2 make up the Inception period, leading to the Life Cycle Objectives (LCO) milestone review; iterations 3 and 4 make up the Elaboration period, leading to the Life Cycle Architecture (LCA) milestone review; iteration 5, 6 and 7 make up the Construction period, leading to Initial Operating Capability (IOC) and review. The subsequent Transition period brings the fully integrated release into operations.
- Activities, by topic
- Activities, by time
- Teams
- Inception Period Iteration 1 (Oct 12 to Dec 2, 2009)
- Iteration 1 Design Period (Oct 12 to Oct 23, 2009)
- Subsystem R1 I1 Design Period Report
- Wrap-Up Reviews
- Inception Period Iteration 2 (Dec 3 to Feb 11)
- Iteration 2 Design Period (Dec 3 to Dec 16, 2009)
- Life Cycle Objectives (LCO) Review Release 1 (Feb 12 to Feb 26)
- Recent: Field Deployment of the OSSE (Observing System Simulation Experiment) prototype, Nov 2-13 2009, mid-Atlantic Bight
CI Development Calendar
Cyberinfrastructure Construction Start
The OOI program started in September 2009 with the CI construction effort commencing in early October 2009. The OOI CI partnership is holding its team meeting to finalize plans and coordinate the details associated with Release 1 - "Data Distribution Network" outside Boulder CO in early September.
- OOI CI Kick-Off Meeting, Sept 9-11, 2009, summarizing progress on the designs and prototype investigations to date and finalize construction plans
Current Pre-Construction Prototype Investigations
The emphasis of OOI CI development during the pilot period (Jan 2009 continuing through Dec 2009) is on risk reduction through prototyping and on getting ready for construction. Many of the prototype projects follow a 6 week iteration cycle.
- Overview of Prototypes: Table listing OOI prototypes and their descriptions
- Prototypes Integration and Dependencies (historical)
- The Prototypes are targeted to reduce the Risk that complex components of the OOI pose to the system functionality
- Ongoing Prototypes:
Agent Contract Network,
Cloud Provisioning Environment,
Collaboration Tools,
Data Exchange,
Global Load Balancing,
Messaging Service,
OMF Collaboration,
OSSE,
Semantic Framework Integration Prototype,
SQLstream Prototype,
Unstructured Grid Services (with Hyrax integration) - Completed Prototypes: Data Distribution Network Version 1 and others
Background and References
- Background Materials provides references to selected background materials
New developers tutorial
OOI CI Development Infrastructure and Activities
- Project Infrastructure
- Software Development Environment
- System Administration
- Technology Research
- Testing, Verification and Validation